Tile Roofs of Texas repaired a twenty-by-seventeen-foot TPO leak above a closet on this Spicewood property, removing the parapet wall’s metal cover, membrane, and flashing before installing a new TPO membrane and matching metal cap. The crew identified that the roof had only one drain and recommended adding a scupper as an emergency overflow, addressing the drainage design rather than just resealing the existing leak.


